The eaves board is an essential building component designed to effectively divert rainwater away from structures and walls located under the eaves. This not only helps maintain the integrity of the building but also enhances its aesthetic appeal.

,

Function

,

- Rainwater Diversion: Our eaves boards guide rainwater from the roof to designated discharge points, preventing direct contact with walls. This minimizes erosion caused by rainwater, safeguarding the wall structure from potential water damage.
- Decorative Enhancement: In addition to its protective role, the eaves board adds depth and a three-dimensional effect to the building's design, elevating its overall beauty. Particularly in traditional and antique architecture, these eaves boards are often paired with other architectural elements, showcasing a distinctive style that is cherished in China.

,

As a leading manufacturer in China, we are proud to supply high-quality eaves boards that combine functionality with elegant design. Our factory employs the latest technology to ensure durable and aesthetically pleasing products tailored to meet your architectural needs.

,

    Specification

    Name Drip eaves board
    Material 1. Sodium silicate + Nano Modified Calcium + PMMA ; 2. PVC asa / Synthetic resin
    Application Must use together with the main tile, for COVER THE ROOFING TOP
    Service life 20 years - 50 years
    Dimension Length: 1050MM ;
    Thickness 2.3MM
    Weight 3.6kg/pc
    Color Usual color - Grey, Red, Blue, Orange, Accept custom
    Advantage Super Corrosion resistance; long lasting color; Easy install, etc.
    zaa

    About Installation

    When installing drip eaves, pay attention to the following points:

    Preparation before installation
    First make sure that the base is flat and firm, without cracks or looseness. If there are any problems, repair them in advance. At the same time, select the drip eaves according to the design requirements and check the quality. If the specifications are not met or there are damages, they cannot be used. Also prepare materials such as sealants, nails, and tools such as electric drills.
    Installation process
    The position of the eaves is crucial. It is determined according to the roof drainage slope and architectural design to ensure smooth drainage. When fixing, fix it with screws or nails, with uniform spacing, and increase the density of corners and joints to ensure stability. The connections between the boards are tight, leaving no gaps to prevent rain leakage, and the joints can be sealed with sealants.
    Inspection after installation
    After completion, check the installation firmness and shake it gently to see if it is loose. At the same time, check the sealing and drainage, and make timely corrections if there are gaps or poor drainage.

    Frequently Asked Questions

    Q1: What materials are used to manufacture the drip eaves board?
    The drip eaves board is manufactured using premium materials. You can choose between: 1) Sodium silicate + Nano Modified Calcium + PMMA, or 2) PVC ASA / Synthetic resin.
    Q2: What is the estimated service life of the drip eaves board?
    Depending on the specific environment and installation quality, the service life of these boards ranges from 20 years to 50 years.
    Q3: What are the key advantages of using this drip eaves board?
    Key advantages include super corrosion resistance, long-lasting color retention, and an easy installation process.
    Q4: How should I prepare the surface before installing the drip eaves?
    Before installation, ensure the base is flat, firm, and completely free of cracks or looseness. Any defects must be repaired beforehand. Ensure the selected boards meet design specifications and are free of damage.
    Q5: How do you prevent water leakage during the installation process?
    To prevent leakage, ensure the connections between the boards are tight and leave no gaps. You should secure them with screws or nails at uniform spacing, increase density at corners/joints, and seal the joints properly using sealants.
    Q6: What steps should be taken after installation is complete?
    After installation, check the firmness by shaking the boards gently to ensure they are not loose. Inspect the sealing and drainage, and make timely corrections if any gaps or poor drainage issues are found.