logo
Leave Your Message
China Suppliers Factory Roofing Eaves Board - PVC ASA Material for House Water Protection and Decoration
Hot Products

China Suppliers Factory Roofing Eaves Board - PVC ASA Material for House Water Protection and Decoration

The eaves board is an essential building component, primarily designed to prevent rainwater from directly soaking the structure and walls beneath the eaves, **Functionality**, - **Rainwater Diversion**: This feature guides rainwater on the roof to a designated discharge point, thereby preventing it from washing against the walls. This helps to reduce rainwater erosion on the walls, safeguarding the wall structure from potential water damage, - **Aesthetic Appeal**: The eaves board adds depth and a three-dimensional quality to the building's design, enhancing its overall beauty. This is particularly significant in traditional and antique structures, where drip eaves are used in conjunction with other architectural elements to create a distinctive style, As a leading China supplier, we take pride in manufacturing high-quality eaves boards in our factory, ensuring durability and performance for all your building needs

    Specification

    Name Drip eaves board
    Material 1. Sodium silicate + Nano Modified Calcium + PMMA
    2. PVC asa / Synthetic resin
    Application Must use together with the main tile, for COVER THE ROOFING TOP
    Service life 20 years - 50 years
    Dimension Length: 1050MM
    Thickness 2.3MM
    Weight 3.6kg/pc
    Color Usual color: Grey, Red, Blue, Orange (Accept custom)
    Advantage Super Corrosion resistance; long lasting color; Easy install, etc.
    zaa

    About Installation

    When installing drip eaves, pay attention to the following points:
    Preparation before installation
    First make sure that the base is flat and firm, without cracks or looseness. If there are any problems, repair them in advance. At the same time, select the drip eaves according to the design requirements and check the quality. If the specifications are not met or there are damages, they cannot be used. Also prepare materials such as sealants, nails, and tools such as electric drills.
    Installation process
    The position of the eaves is crucial. It is determined according to the roof drainage slope and architectural design to ensure smooth drainage. When fixing, fix it with screws or nails, with uniform spacing, and increase the density of corners and joints to ensure stability. The connections between the boards are tight, leaving no gaps to prevent rain leakage, and the joints can be sealed with sealants.
    Inspection after installation
    After completion, check the installation firmness and shake it gently to see if it is loose. At the same time, check the sealing and drainage, and make timely corrections if there are gaps or poor drainage.

    Frequently Asked Questions

    Q1: What materials are used to manufacture the drip eaves board?

    The drip eaves board is manufactured using two main material options: either a combination of Sodium silicate + Nano Modified Calcium + PMMA, or PVC asa / Synthetic resin.

    Q2: What is the expected service life of the drip eaves board?

    The drip eaves board is highly durable and offers a long service life ranging from 20 years up to 50 years.

    Q3: What are the key advantages of this drip eaves board?

    The main advantages include super corrosion resistance, long-lasting color stability, and an easy installation process.

    Q4: What preparations are required before starting the installation?

    Before installation, ensure the base is flat, firm, and free of cracks or looseness. Check the quality and specifications of the drip eaves, discard any damaged pieces, and prepare necessary tools and materials such as sealants, nails, and electric drills.

    Q5: How do you prevent rain leakage during the installation process?

    To prevent rain leakage, ensure the connections between the boards are tight with no gaps. Fix them securely with screws or nails at uniform spacing, increase density at corners and joints, and seal the joints thoroughly using sealant.

    Q6: What should be inspected after the installation is complete?

    After completion, gently shake the installation to verify its firmness and ensure nothing is loose. Additionally, check the sealing and drainage functionality, making immediate corrections if you find any gaps or poor drainage.